Take the Guesswork Out of Project Planning with Parametric Estimating

Max 9 min read

Take the Guesswork Out of Project Planning with Parametric Estimating
Start Reading

Click the button to start reading

Take the Guesswork Out of Project Planning with Parametric Estimating

Are you looking for a reliable and accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.

It uses statistical data and analysis to accurately predict what will happen and help find opportunities and risks. It’s like having a project management crystal ball.

And best of all, it usually works in sync with other estimation techniques like expert judgment or analogous estimating. So, if you want a better understanding of how parametric estimating works, then you came to the right place.

Image represents Parametric Estimating

What is Parametric Estimating?

Parametric estimating is a way to determine how much a project will cost, how long it will take, and other details using mathematical models and statistical methods.

It uses known connections between variables to make an estimate based on past data. The key is that it uses historical-existing data to make projections.

This method uses statistical analysis to predict the cost or duration of a project based on a correlation between a parameter and a value, like a cost or time.

It’s commonly used in project management frameworks like the PMI’s PMBOK and is a go-to for many industries like construction, consulting, and IT.

To use parametric estimating, you’ll need some data to work with. This could be from previous projects, market data, or benchmarking statistics.

Depending on the size and complexity of your project, there are different ways to use parametric estimating. For example, suppose you’re overseeing larger projects. In that case, it requires more detailed statistical models and regression analysis, while smaller projects can get by with simple functions or the “rule of three.”

Here’s a Simple Example

For example, let’s say you want to predict the cost of materials for a construction project. You can use the following formula to create an estimate: Cost Estimate = A + B (Material Quantity) + C (Labor Hours), where A and C are fixed variables representing overhead and labor costs per hour, respectively. B is a variable that represents the cost of materials necessary for the job. With this formula, we can plug in data from similar projects and get an estimate for our current project.

Parametric estimates can tell us how much a project will cost, how long it will take, and how many resources it will need. By collecting data from previous projects with similar scope or complexity, you can build models that accurately predict how many resources you will need at each stage of our project.

This helps us plan better and avoid mistakes that cost a lot of money because we needed to hire more people or get the resources we needed too late in the project’s timeline.

One thing to remember is that parametric estimating relies on the assumption that there is a correlation between the parameters and the values you’re working with. So, you need good data and expert judgment to make sure your estimates are correct and useful for your project.

Image represents Use-Cases in Project Management

Use-Cases in Project Management

Parametric estimating is used in numerous ways in project management. Here are some examples of how this technique is applied:

  • Forecasting budget – by gathering data from similar projects, we can form an estimate of how much money this particular one will cost us.
  • Predicting duration – by analyzing data from past projects with similar scope or complexity, we can establish relationships between variables such as staffing and time needed.
  • Determining material costs – understanding the price of materials relative to quantities used allows us to better understand how much money needs to be budgeted for supplies.
  • Calculating resources required – by understanding what types of people are needed at various stages of the process, we can make sure that each task has enough personnel assigned to it.
  • Generating progress reports – collecting data throughout the course of different projects allows us to generate accurate progress reports that give us insight into where we are currently compared with our original goals.
  • Building financial models– using established relationships between variables such as labor hours and overhead costs gives us insight into our current expenses and what they could potentially be later down the line if circumstances change.

Image represents Parametric Estimating Advantages

Advantages of Parametric Estimating

Parametric estimating has several advantages over other estimation techniques. Here’s a quick list:

  • Increased Accuracy Compared to Other Methods
  • Ability to Update Estimates Easily
  • Ease of Use and Quick Turnaround Time
  • Reduced Bias and Errors in Judgment

Increased Accuracy Compared to Other Methods

One of its most significant advantages is its increased accuracy compared to other methods. In addition, because parametric estimates take into account numerous variables that may affect a project’s outcome—such as scope, complexity, resource availability, geography, and technology level—they can provide more reliable estimates than those generated using expert judgment or analogous estimation.

Ability to Update Estimates Easily

Additionally, because parametric estimates are based on data-driven models rather than subjective opinions or guesswork, they can be easily updated if conditions on the ground change during the project. This is an important thing for project managers to think about because it lets them change the estimate as needed and keep the project moving forward.

Ease of Use and Quick Turnaround Time

Another advantage of parametric estimating is its ease of use and quick turnaround time. Unlike other estimation techniques, which require extensive research or expert opinion collection from multiple sources, parametric estimates can be quickly generated with minimal effort by simply inputting data into a model. This makes it an ideal choice for project managers who need quick answers but don’t have the time or resources to conduct extensive research on their own.

Reduced Bias and Errors in Judgment

Finally, because parametric estimates are based on data-driven models rather than subjective opinions or guesswork, they are less prone to bias or errors in judgment, which can lead to inaccurate predictions about project outcomes. This reduces the risk of unexpected costs or delays and helps to ensure that the project stays on track.

Image represents The Downside Side of Parametric Estimating

The Downside Side of Parametric Estimating

Parametric estimating is a powerful tool for project managers to estimate the cost and duration of projects. But, as with any tool, there are pros and cons. In this section, we’ll take a deep dive into the disadvantages of parametric estimating.

Reliability Issues

The accuracy of parametric estimates depends heavily on the quality of the data used in the analysis. Any errors or omissions in this data will affect the reliability of the results given by your software. This means you must have accurate, comprehensive data from past projects or project components to get a precise assessment. If you lack reliable data, you may be unable to use parametric estimates.

Scope Limitations

Parametric estimating also has some limitations when it comes to its scope. It only works for projects that are about the same size and level of difficulty as ones that have already been done. This means that you might not be able to use parametric estimation if you are working on a very unique project or one with many parts that have never been done before because there isn’t enough data from similar projects or parts.

Data-Dependency

Finally, since parametric estimation relies so heavily on past data points to create models, it can be difficult for new organizations or companies lacking historical data to get an accurate estimate from their software programs. In these situations, traditional methods might have to be used until enough historical data is collected to make more accurate models with parametric estimation software.

While these drawbacks can limit its effectiveness in some situations, it remains an effective tool when used correctly and when sufficient quality control measures are considered during the estimation process.

Comparing other estimating techniques

Comparing other estimating techniques

When estimating the resources and time needed for a project, there are a few different techniques to choose from.

Analogous Estimation

One technique that’s similar to parametric estimating is “analogous estimation.” Like parametric estimating, “analogous estimation” relies on data from past projects to predict the outcomes of the current project.

However, it doesn’t use statistical analysis to establish relationships between variables and make projections. Instead, it relies on expert judgment to compare the current project to a similar project that has already been completed.

Three-point estimation

Another option is “three-point estimation,” which involves generating three different estimates for a project: a best-case scenario, a most likely scenario, and a worst-case scenario. These estimates are then combined to create a more accurate overall assessment of the project.

The benefit of “three-point estimation” is that it takes into account the possibility of uncertainty and helps figure out what risks and opportunities might be there.

However, it can be time-consuming to generate the three separate estimates. Also, they may not be as accurate as parametric estimates if the data used to make the estimates is unreliable.

Expert judgment

“Expert judgment” is another technique that can be used to estimate the resources and time needed for a project. This involves relying on the expertise and experience of subject matter experts to make predictions about the project.

“Expert judgment” can be useful in situations where data is limited or there are unique or complex aspects of the project that can’t be easily quantified. But it can be subjective and may not be as accurate as methods like parametric estimating that are based on data.

So, which technique is best for your project? It really depends on the specifics of your project and the resources you have available. For example, parametric estimating is often a good choice because of its increased accuracy and ease of use, but it may only be practical if you have key data to work with.

On the other hand, analogous estimation and expert judgment can be helpful when there isn’t enough data, but they may not be as reliable. Ultimately, the best technique will depend on your project’s specific needs and constraints.

Image represents When to Use Parametric Estimating

When to Use Parametric Estimating

If you’ve been following along, you know that parametric estimating can be incredibly helpful for project managers. But how do you know if it’s the right choice for your project?

First, it’s essential to consider the size and complexity of your project. Parametric estimating is most effective when you have enough historical data to create accurate models that can be used to make reliable predictions.

If your project is small or straightforward, parametric estimating may not be necessary. But if it’s large or complex, then parametric estimating can be a great way to get an accurate read on the resources and time needed.

Second, it’s important to consider the accuracy requirements for your project. If you need precise estimates to make reliable decisions, then parametric estimating can be a great choice.

On the other hand, if you’re looking for a more general estimate, then it may be better to use analogous estimation or expert judgment.

Finally, consider the resources and expertise available to you. Parametric estimating can be complex and time-consuming, so you must have access to enough data and knowledgeable experts to make it work.

If you need more resources or expertise, then another estimation technique may be a better choice.

Conclusion

Parametric estimating is a potent tool for efficient and effective project management.

It requires sufficient amounts of data from similar projects or components within a single larger-scale project to produce valuable results, but when done correctly, it provides invaluable insight into budgeting, forecasting durations, calculating material costs, determining resource requirements, generating progress reports, and building financial models for future planning purposes.

In the end, the best way to estimate your project will depend on its size and complexity, the level of accuracy you need, and the resources you have at your disposal.

Manage Your Remote
Team With Teamly. Get your 100% FREE account today.

Get Teamly FREE

PC and Mac compatible

image

Teamly is everywhere you need it to be. Desktop download or web browser or IOS/Android app. Take your pick.

Get Teamly for FREE by
clicking below.

No credit card required. Completely free
Get Teamly For FREE

PC and Mac compatible

  • imageChat with your team in real-time
  • imageCreate tasks and workflows with ease
  • imageScreen cam video recording, audio messages and more
  • imageTrack and monitor employee time worked
Teamly puts everything in one place, so you can start and finish projects quickly and efficiently.

Keep Reading

Image represents why project managers are important

Management

Why Every Project Needs a Captain: The Importance of Project Managers

Why Every Project Needs a Captain: The Importance of Project ManagersImagine a scenario where a project is like a ship sailing without a captain. There’s no one to steer, no one to plan the route, and no one to keep things on track. Everyone on the project team is trying their best, but there’s confusion. …

Read More

Max 8 min read

Image represents Team Structure

Team Building

Structure Matters: How to Design an Effective Team for Your Organization

Structure Matters: How to Design an Effective Team for Your OrganizationBack in grade school, did you ever have a class where you aced every test and answered all the questions right, and then the following year, you had a teacher and a classroom where everyone else seemed to understand what was going on, but you …

Read More

Max 23 min read

Eat That Frog

Productivity

It’s Crunch Time: How Eating the Frog Cures the Loafer in Us All

It’s Crunch Time: How Eating the Frog Cures the Loafer in Us AllRenew license plate tabs, schedule dentist appointment, empty inbox, go to gym, call air-conditioner repair, purchase light bulbs: if you’re like everybody else, your daily to-do list includes at least one or two pesky tasks you’d just as soon save for tomorrow. The …

Read More

Max 8 min read

Get Teamly for FREE Enter your email and create your account today!

You must enter a valid email address