{"id":7528,"date":"2023-01-17T13:34:35","date_gmt":"2023-01-17T13:34:35","guid":{"rendered":"https:\/\/www.teamly.com\/blog\/?p=7528"},"modified":"2023-01-17T13:43:26","modified_gmt":"2023-01-17T13:43:26","slug":"parametric-estimating-in-project-management","status":"publish","type":"post","link":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/","title":{"rendered":"Take the Guesswork Out of Project Planning with Parametric Estimating"},"content":{"rendered":"<p>Are you looking for a reliable and accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.<\/p>\n<p>It uses statistical data and analysis to accurately predict what will happen and help find opportunities and risks. It&#8217;s like having a project management crystal ball.<\/p>\n<p>And best of all, it usually works in sync with other estimation techniques like expert judgment or analogous estimating. So, if you want a better understanding of how parametric estimating works, then you came to the right place.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7531 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/What-is-Parametric-Estimating.png\" alt=\"Image represents Parametric Estimating\" width=\"828\" height=\"381\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/What-is-Parametric-Estimating.png 828w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/What-is-Parametric-Estimating-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/What-is-Parametric-Estimating-768x353.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"what_is_parametric_estimating\"><\/span>What is Parametric Estimating?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Parametric estimating is a way to determine how much a project will cost, how long it will take, and other details using mathematical models and statistical methods.<\/p>\n<p>It uses known connections between variables to make an estimate based on past data. The key is that it uses historical-existing data to make projections.<\/p>\n<p>This method uses statistical analysis to predict the cost or duration of a project based on a correlation between a parameter and a value, like a cost or time.<\/p>\n<p>It&#8217;s commonly used in project management frameworks like the PMI&#8217;s PMBOK and is a go-to for many industries like construction, consulting, and IT.<\/p>\n<p>To use parametric estimating, you&#8217;ll need some data to work with. This could be from previous projects, market data, or benchmarking statistics.<\/p>\n<p>Depending on the size and complexity of your project, there are different ways to use parametric estimating. For example, suppose you&#8217;re overseeing larger projects. In that case, it requires more detailed statistical models and regression analysis, while smaller projects can get by with simple functions or the &#8220;rule of three.\u201d<\/p>\n<h2><span class=\"ez-toc-section\" id=\"heres_a_simple_example\"><\/span>Here&#8217;s a Simple Example<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For example, let&#8217;s say you want to predict the cost of materials for a construction project. You can use the following formula to create an estimate: Cost Estimate = A + B (Material Quantity) + C (Labor Hours), where A and C are fixed variables representing overhead and labor costs per hour, respectively. B is a variable that represents the cost of materials necessary for the job. With this formula, we can plug in data from similar projects and get an estimate for our current project.<\/p>\n<p>Parametric estimates can tell us how much a project will cost, how long it will take, and how many resources it will need. By collecting data from previous projects with similar scope or complexity, you can build models that accurately predict how many resources you will need at each stage of our project.<\/p>\n<p>This helps us plan better and avoid mistakes that cost a lot of money because we needed to hire more people or get the resources we needed too late in the project&#8217;s timeline.<\/p>\n<p>One thing to remember is that parametric estimating relies on the assumption that there is a correlation between the parameters and the values you&#8217;re working with. So, you need good data and expert judgment to make sure your estimates are correct and useful for your project.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7532 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Use-Cases-in-Project-Management.png\" alt=\"Image represents Use-Cases in Project Management\" width=\"828\" height=\"381\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Use-Cases-in-Project-Management.png 828w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Use-Cases-in-Project-Management-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Use-Cases-in-Project-Management-768x353.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"use-cases_in_project_management\"><\/span>Use-Cases in Project Management<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Parametric estimating is used in numerous ways in project management. Here are some examples of how this technique is applied:<\/p>\n<ul>\n<li><strong>Forecasting budget<\/strong> \u2013 by gathering data from similar projects, we can form an estimate of how much money this particular one will cost us.<\/li>\n<li><strong>Predicting duration<\/strong> \u2013 by analyzing data from past projects with similar scope or complexity, we can establish relationships between variables such as staffing and time needed.<\/li>\n<li><strong>Determining material costs<\/strong> \u2013 understanding the price of materials relative to quantities used allows us to better understand how much money needs to be budgeted for supplies.<\/li>\n<li><strong>Calculating resources required<\/strong> \u2013 by understanding what types of people are needed at various stages of the process, we can make sure that each task has enough personnel assigned to it.<\/li>\n<li><strong>Generating progress reports<\/strong> \u2013 collecting data throughout the course of different projects allows us to generate accurate progress reports that give us insight into where we are currently compared with our original goals.<\/li>\n<li><strong>Building financial models<\/strong>\u2013 using established relationships between variables such as labor hours and overhead costs gives us insight into our current expenses and what they could potentially be later down the line if circumstances change.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7533 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-Advantages.png\" alt=\"Image represents Parametric Estimating Advantages\" width=\"828\" height=\"381\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-Advantages.png 828w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-Advantages-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-Advantages-768x353.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"advantages_of_parametric_estimating\"><\/span>Advantages of Parametric Estimating<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Parametric estimating has several advantages over other estimation techniques. Here&#8217;s a quick list:<\/p>\n<ul>\n<li>Increased Accuracy Compared to Other Methods<\/li>\n<li>Ability to Update Estimates Easily<\/li>\n<li>Ease of Use and Quick Turnaround Time<\/li>\n<li>Reduced Bias and Errors in Judgment<\/li>\n<\/ul>\n<h3>Increased Accuracy Compared to Other Methods<\/h3>\n<p>One of its most significant advantages is its increased accuracy compared to other methods. In addition, because parametric estimates take into account numerous variables that may affect a project&#8217;s outcome\u2014such as scope, complexity, resource availability, geography, and technology level\u2014they can provide more reliable estimates than those generated using expert judgment or analogous estimation.<\/p>\n<h3>Ability to Update Estimates Easily<\/h3>\n<p>Additionally, because parametric estimates are based on data-driven models rather than subjective opinions or guesswork, they can be easily updated if conditions on the ground change during the project. This is an important thing for project managers to think about because it lets them change the estimate as needed and keep the project moving forward.<\/p>\n<h3>Ease of Use and Quick Turnaround Time<\/h3>\n<p>Another advantage of parametric estimating is its ease of use and quick turnaround time. Unlike other estimation techniques, which require extensive research or expert opinion collection from multiple sources, parametric estimates can be quickly generated with minimal effort by simply inputting data into a model. This makes it an ideal choice for project managers who need quick answers but don&#8217;t have the time or resources to conduct extensive research on their own.<\/p>\n<h3>Reduced Bias and Errors in Judgment<\/h3>\n<p>Finally, because parametric estimates are based on data-driven models rather than subjective opinions or guesswork, they are less prone to bias or errors in judgment, which can lead to inaccurate predictions about project outcomes. This reduces the risk of unexpected costs or delays and helps to ensure that the project stays on track.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7534 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/The-Downside-Side-of-Parametric-Estimating.png\" alt=\"Image represents The Downside Side of Parametric Estimating\" width=\"828\" height=\"381\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/The-Downside-Side-of-Parametric-Estimating.png 828w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/The-Downside-Side-of-Parametric-Estimating-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/The-Downside-Side-of-Parametric-Estimating-768x353.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"the_downside_side_of_parametric_estimating\"><\/span>The Downside Side of Parametric Estimating<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Parametric estimating is a powerful tool for project managers to estimate the cost and duration of projects. But, as with any tool, there are pros and cons. In this section, we&#8217;ll take a deep dive into the disadvantages of parametric estimating.<\/p>\n<h3>Reliability Issues<\/h3>\n<p>The accuracy of parametric estimates depends heavily on the quality of the data used in the analysis. Any errors or omissions in this data will affect the reliability of the results given by your software. This means you must have accurate, comprehensive data from past projects or project components to get a precise assessment. If you lack reliable data, you may be unable to use parametric estimates.<\/p>\n<h3>Scope Limitations<\/h3>\n<p>Parametric estimating also has some limitations when it comes to its scope. It only works for projects that are about the same size and level of difficulty as ones that have already been done. This means that you might not be able to use parametric estimation if you are working on a very unique project or one with many parts that have never been done before because there isn&#8217;t enough data from similar projects or parts.<\/p>\n<h3>Data-Dependency<\/h3>\n<p>Finally, since parametric estimation relies so heavily on past data points to create models, it can be difficult for new organizations or companies lacking historical data to get an accurate estimate from their software programs. In these situations, traditional methods might have to be used until enough historical data is collected to make more accurate models with parametric estimation software.<\/p>\n<p><em>While these drawbacks can limit its effectiveness in some situations, it remains an effective tool when used correctly and when sufficient quality control measures are considered during the estimation process.<\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7535 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Comparing-other-estimating-techniques.png\" alt=\"Comparing other estimating techniques\" width=\"828\" height=\"381\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Comparing-other-estimating-techniques.png 828w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Comparing-other-estimating-techniques-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Comparing-other-estimating-techniques-768x353.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"comparing_other_estimating_techniques\"><\/span>Comparing other estimating techniques<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>When estimating the resources and time needed for a project, there are a few different techniques to choose from.<\/p>\n<h3>Analogous Estimation<\/h3>\n<p>One technique that&#8217;s similar to parametric estimating is \u201canalogous estimation.\u201d Like parametric estimating, \u201canalogous estimation\u201d relies on data from past projects to predict the outcomes of the current project.<\/p>\n<p>However, it doesn&#8217;t use statistical analysis to establish relationships between variables and make projections. Instead, it relies on expert judgment to compare the current project to a similar project that has already been completed.<\/p>\n<h3>Three-point estimation<\/h3>\n<p>Another option is \u201cthree-point estimation,\u201d which involves generating three different estimates for a project: a best-case scenario, a most likely scenario, and a worst-case scenario. These estimates are then combined to create a more accurate overall assessment of the project.<\/p>\n<p>The benefit of \u201cthree-point estimation\u201d is that it takes into account the possibility of uncertainty and helps figure out what risks and opportunities might be there.<\/p>\n<p>However, it can be time-consuming to generate the three separate estimates. Also, they may not be as accurate as parametric estimates if the data used to make the estimates is unreliable.<\/p>\n<h3>Expert judgment<\/h3>\n<p>\u201cExpert judgment\u201d is another technique that can be used to estimate the resources and time needed for a project. This involves relying on the expertise and experience of subject matter experts to make predictions about the project.<\/p>\n<p>\u201cExpert judgment\u201d can be useful in situations where data is limited or there are unique or complex aspects of the project that can&#8217;t be easily quantified. But it can be subjective and may not be as accurate as methods like parametric estimating that are based on data.<\/p>\n<p><em>So, which technique is best for your project? It really depends on the specifics of your project and the resources you have available. For example, parametric estimating is often a good choice because of its increased accuracy and ease of use, but it may only be practical if you have key data to work with.<\/em><\/p>\n<p><em>On the other hand, analogous estimation and expert judgment can be helpful when there isn&#8217;t enough data, but they may not be as reliable. Ultimately, the best technique will depend on your project&#8217;s specific needs and constraints.<\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7536 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/When-to-Use-Parametric-Estimating.png\" alt=\"Image represents When to Use Parametric Estimating\" width=\"828\" height=\"381\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/When-to-Use-Parametric-Estimating.png 828w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/When-to-Use-Parametric-Estimating-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/When-to-Use-Parametric-Estimating-768x353.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"when_to_use_parametric_estimating\"><\/span>When to Use Parametric Estimating<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>If you&#8217;ve been following along, you know that parametric estimating can be incredibly helpful for project managers. But how do you know if it&#8217;s the right choice for your project?<\/p>\n<p>First, it&#8217;s essential to consider the size and complexity of your project. Parametric estimating is most effective when you have enough historical data to create accurate models that can be used to make reliable predictions.<\/p>\n<p>If your project is small or straightforward, parametric estimating may not be necessary. But if it&#8217;s large or complex, then parametric estimating can be a great way to get an accurate read on the resources and time needed.<\/p>\n<p>Second, it&#8217;s important to consider the accuracy requirements for your project. If you need precise estimates to make reliable decisions, then parametric estimating can be a great choice.<\/p>\n<p>On the other hand, if you&#8217;re looking for a more general estimate, then it may be better to use analogous estimation or expert judgment.<\/p>\n<p>Finally, consider the resources and expertise available to you. Parametric estimating can be complex and time-consuming, so you must have access to enough data and knowledgeable experts to make it work.<\/p>\n<p>If you need more resources or expertise, then another estimation technique may be a better choice.<\/p>\n<div style=\"background-color: #eaeffc;\">\n<h2><span class=\"ez-toc-section\" id=\"conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Parametric estimating is a potent tool for efficient and effective project management.<\/p>\n<p>It requires sufficient amounts of data from similar projects or components within a single larger-scale project to produce valuable results, but when done correctly, it provides invaluable insight into budgeting, forecasting durations, calculating material costs, determining resource requirements, generating progress reports, and building financial models for future planning purposes.<\/p>\n<p>In the end, the best way to estimate your project will depend on its size and complexity, the level of accuracy you need, and the resources you have at your disposal.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Are you looking for a reliable and accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful. It uses statistical data and analysis to accurately predict what will happen and help find opportunities and risks. It&#8217;s like having a project management crystal ball. And best &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Take the Guesswork Out of Project Planning with Parametric Estimating&#8221;<\/span><\/a><\/p>\n","protected":false},"author":17,"featured_media":7530,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-7528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Parametric Estimating in Project Management - Detailed Guide<\/title>\n<meta name=\"description\" content=\"Are you looking for an accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Parametric Estimating in Project Management - Detailed Guide\" \/>\n<meta property=\"og:description\" content=\"Are you looking for an accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/\" \/>\n<meta property=\"og:site_name\" content=\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-17T13:34:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-17T13:43:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-in-Project-Management.png\" \/>\n\t<meta property=\"og:image:width\" content=\"711\" \/>\n\t<meta property=\"og:image:height\" content=\"463\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Tim Barenscheer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tim Barenscheer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/\"},\"author\":{\"name\":\"Tim Barenscheer\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/f1a03a4dfdf615a5825ac3f9a0c848ee\"},\"headline\":\"Take the Guesswork Out of Project Planning with Parametric Estimating\",\"datePublished\":\"2023-01-17T13:34:35+00:00\",\"dateModified\":\"2023-01-17T13:43:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/\"},\"wordCount\":1945,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Parametric-Estimating-in-Project-Management.png\",\"articleSection\":[\"Project Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/\",\"name\":\"Parametric Estimating in Project Management - Detailed Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Parametric-Estimating-in-Project-Management.png\",\"datePublished\":\"2023-01-17T13:34:35+00:00\",\"dateModified\":\"2023-01-17T13:43:26+00:00\",\"description\":\"Are you looking for an accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Parametric-Estimating-in-Project-Management.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Parametric-Estimating-in-Project-Management.png\",\"width\":711,\"height\":463,\"caption\":\"parametric estimating in project management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/parametric-estimating-in-project-management\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Take the Guesswork Out of Project Planning with Parametric Estimating\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"description\":\"Your Project Management Resource\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"width\":150,\"height\":39,\"caption\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teamly\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/f1a03a4dfdf615a5825ac3f9a0c848ee\",\"name\":\"Tim Barenscheer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g\",\"caption\":\"Tim Barenscheer\"},\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/author\\\/timbarenscheer\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Parametric Estimating in Project Management - Detailed Guide","description":"Are you looking for an accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/","og_locale":"en_US","og_type":"article","og_title":"Parametric Estimating in Project Management - Detailed Guide","og_description":"Are you looking for an accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.","og_url":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/","og_site_name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","article_published_time":"2023-01-17T13:34:35+00:00","article_modified_time":"2023-01-17T13:43:26+00:00","og_image":[{"width":711,"height":463,"url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-in-Project-Management.png","type":"image\/png"}],"author":"Tim Barenscheer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tim Barenscheer","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#article","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/"},"author":{"name":"Tim Barenscheer","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/f1a03a4dfdf615a5825ac3f9a0c848ee"},"headline":"Take the Guesswork Out of Project Planning with Parametric Estimating","datePublished":"2023-01-17T13:34:35+00:00","dateModified":"2023-01-17T13:43:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/"},"wordCount":1945,"commentCount":0,"publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-in-Project-Management.png","articleSection":["Project Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/","url":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/","name":"Parametric Estimating in Project Management - Detailed Guide","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#primaryimage"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-in-Project-Management.png","datePublished":"2023-01-17T13:34:35+00:00","dateModified":"2023-01-17T13:43:26+00:00","description":"Are you looking for an accurate way to estimate the cost, schedule, or other project variables before they begin? Parametric estimating can be extremely useful.","breadcrumb":{"@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#primaryimage","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-in-Project-Management.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2023\/01\/Parametric-Estimating-in-Project-Management.png","width":711,"height":463,"caption":"parametric estimating in project management"},{"@type":"BreadcrumbList","@id":"https:\/\/www.teamly.com\/blog\/parametric-estimating-in-project-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.teamly.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Take the Guesswork Out of Project Planning with Parametric Estimating"}]},{"@type":"WebSite","@id":"https:\/\/www.teamly.com\/blog\/#website","url":"https:\/\/www.teamly.com\/blog\/","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","description":"Your Project Management Resource","publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.teamly.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.teamly.com\/blog\/#organization","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","url":"https:\/\/www.teamly.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","width":150,"height":39,"caption":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teamly\/"]},{"@type":"Person","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/f1a03a4dfdf615a5825ac3f9a0c848ee","name":"Tim Barenscheer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g","caption":"Tim Barenscheer"},"url":"https:\/\/www.teamly.com\/blog\/author\/timbarenscheer\/"}]}},"_links":{"self":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/7528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/comments?post=7528"}],"version-history":[{"count":4,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/7528\/revisions"}],"predecessor-version":[{"id":7539,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/7528\/revisions\/7539"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media\/7530"}],"wp:attachment":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media?parent=7528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/categories?post=7528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/tags?post=7528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}