{"id":5754,"date":"2022-05-14T09:19:00","date_gmt":"2022-05-14T09:19:00","guid":{"rendered":"https:\/\/www.teamly.com\/blog\/?p=5754"},"modified":"2022-05-15T09:06:47","modified_gmt":"2022-05-15T09:06:47","slug":"positive-risks-in-project-management","status":"publish","type":"post","link":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/","title":{"rendered":"How To Use Positive Risks To Leverage Success in Project Management"},"content":{"rendered":"<p>If you&#8217;re a project manager, chances are that you&#8217;ve dealt with plenty of risks in the past. After all, part of your job is to identify potential threats to the project and develop plans to mitigate them. But what about positive risks?<\/p>\n<p>While they may seem like an oxymoron, positive risks are a real and often underutilized tool in project management. By taking advantage of these risks, you can improve project outcomes and deliver greater value to your stakeholders.<\/p>\n<p>In this blog post, we&#8217;re going to take a closer look at positive risks \u2013 what they are, why you should factor them into your project management plan, and how to leverage them if they do crop up. Are you ready? Let&#8217;s dive in!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-5758 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/What-is-a-positive-risk.png\" alt=\"What is a positive risk\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/What-is-a-positive-risk.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/What-is-a-positive-risk-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/What-is-a-positive-risk-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"what_is_a_positive_risk\"><\/span>What is a positive risk?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To convey positive risk, we must first define the term &#8220;risk.&#8221; A risk is any unforeseen happening that might have an impact on your project&#8217;s resources, technology, procedures, and people.<\/p>\n<p>Positive risk is an uncertain event or condition that if it occurs, will have a positive impact on one or more of your objectives.<\/p>\n<p>In project management, it&#8217;s important to consider both positive and negative risks when creating your risk management plan.<\/p>\n<p>It&#8217;s important to remember that not all risks will hurt your project. By considering both positive and negative risks, you can create a more comprehensive risk management plan that will help your project to be more successful.<\/p>\n<p>Positive risks should be encouraged and leveraged to achieve a successful outcome for your project. Because they can have a significant impact on the success of your project; they should be managed accordingly.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-5759 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Types-of-positive-risks.png\" alt=\"Types of positive risks\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Types-of-positive-risks.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Types-of-positive-risks-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Types-of-positive-risks-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"what_are_some_common_types_of_positive_risks\"><\/span>What are some common types of positive risks?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>In project management, it&#8217;s important to consider both positive and negative risks when creating your risk management plan.<\/p>\n<p>Some common positive risks in project management include:<\/p>\n<ul>\n<li>A possible future policy change that may be beneficial to your project.<\/li>\n<li>The development of a new technology that could improve your project.<\/li>\n<li>A change in the political climate may have a positive impact on your project.<\/li>\n<li>A grant\/funding that you&#8217;ve applied for and are waiting to hear whether or not you&#8217;ve been accepted.<\/li>\n<li>A request for more resources, materials, tools, or training to make your project run more smoothly.<\/li>\n<\/ul>\n<p>Each of these risks can present both opportunities and challenges for your project. It is important to assess each risk carefully and develop a plan to either exploit or enhance the opportunity.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"when_should_i_take_positive_risks\"><\/span>When should I take positive risks?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>There is no easy answer when it comes to taking positive risks. Every project is different and each situation must be assessed individually. However, some general guidelines can be followed to make the best decision for your project.<\/p>\n<p>Some factors that you should consider when deciding whether or not to take a positive risk include the <strong>impact<\/strong> of the risk, the <strong>likelihood<\/strong> of the risk occurring, and the <strong>resources that are available<\/strong> to manage the risk.<\/p>\n<p>It is also important to take into account the potential impact of the positive risk, including both the benefits and any possible downsides. By carefully weighing all of these factors, you can determine whether or not a positive risk is worth taking for your project.<\/p>\n<p>Ultimately, the decision to take a positive risk should be made on a case-by-case basis, and all risks should be carefully considered before any decisions are made.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-5760 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-to-respond-to-positive-risks-in-project-management.png\" alt=\"How to respond to positive risks in project management\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-to-respond-to-positive-risks-in-project-management.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-to-respond-to-positive-risks-in-project-management-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-to-respond-to-positive-risks-in-project-management-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"how_to_respond_to_positive_risks_in_project_management\"><\/span>How to respond to positive risks in project management<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Identifying and managing risks is the same for both positive and negative types of risk: While the project is still in progress, you must continue to evaluate risks, assess their influence on your project, and keep track of them. You&#8217;ll want to enhance, exploit, or share unfavorable risks rather than avoid or transfer them.<\/p>\n<p><strong>Enhance risks<\/strong> &#8211; Look for ways to make the risk more likely to happen, so you can take advantage of the opportunity. Enhancing the positive risk means attempting to improve it.<\/p>\n<p>For example, let&#8217;s say new technology is being developed that has the potential to improve your project. To enhance this risk, you can look for ways to make sure the new technology is developed and implemented in your project.<\/p>\n<p><strong>Exploit risks<\/strong> &#8211; Exploiting a positive risk means actively working to make sure it occurs. This can be done by taking actions that will increase the likelihood of the risk occurring.<\/p>\n<p>For example, if you are waiting to hear back on a grant that you&#8217;ve applied for, you can exploit this risk by following up with the organization and inquiring about the status of your application.<\/p>\n<p><strong>Share risks<\/strong> &#8211; Sharing a positive risk means involving other people or organizations in the risk. This can be done by partnering with another organization that can help you manage the risk, or by outsourcing part of the project to another company.<\/p>\n<p>For example, if you&#8217;re worried about a possible future policy change that could impact your project, you can share this risk by involving other stakeholders in the decision-making process.<\/p>\n<p><strong>Monitor risks<\/strong> &#8211; Paying attention to project progress will help you identify risks early on. This gives you time to come up with a plan to address the risks before they have a chance to impact your project.<\/p>\n<p>For example, if you are worried about a possible change in the political climate, you can monitor news sources and keep up-to-date on any changes that might occur.<\/p>\n<p>Positive risks in project management can be a great opportunity to improve your project. By carefully assessing each risk and taking steps to exploit or enhance them, you can make sure your project is well-positioned to take advantage of these opportunities.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-5761 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-do-you-manage-stakeholder-expectations.png\" alt=\"How do you manage stakeholder expectations\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-do-you-manage-stakeholder-expectations.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-do-you-manage-stakeholder-expectations-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/How-do-you-manage-stakeholder-expectations-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"how_do_you_manage_stakeholder_expectations_when_it_comes_to_positive_risks_in_your_projects\"><\/span>How do you manage stakeholder expectations when it comes to positive risks in your projects?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>When it comes to managing stakeholder expectations around positive risks in your projects, it is important to be transparent and clear about the potential outcomes. Positive risks can be a great opportunity to improve your project, but they can also be a source of stress and anxiety for stakeholders because they can lead to unexpected results.<\/p>\n<p>When it comes to managing stakeholder expectations around positive risks in your projects, it is important to be transparent and clear about the potential outcomes. Positive risks can be a great opportunity to improve your project, but they can also be a source of stress and anxiety for stakeholders because they can lead to unexpected results.<\/p>\n<p>By being clear about the risks involved and the steps you&#8217;re taking to manage them, you can help alleviate some of the concerns that stakeholders may have.<\/p>\n<p>Additionally, it&#8217;s important to keep stakeholders continually updated on the status of the risk and any changes that occur along the way.<\/p>\n<p>By keeping stakeholders informed and involved in the decision-making process, you can create a level of trust and confidence that will help manage their expectations around positive risks in your project.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-5762 aligncenter\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Tips-for-managing-positive-risks.png\" alt=\"Tips for managing positive risks\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Tips-for-managing-positive-risks.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Tips-for-managing-positive-risks-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Tips-for-managing-positive-risks-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"8_tips_for_managing_positive_risks\"><\/span>8 Tips for managing positive risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Whether you choose to define risk in terms of a negative or positive, the same project management methods and <a href=\"https:\/\/www.teamly.com\/\">tools<\/a> that are used for managing negative risks may also be used to manage positive ones.<\/p>\n<p>There are, however, a few key tips that can help you to more effectively manage positive risks in your project:<\/p>\n<ul>\n<li><strong>Be proactive<\/strong>: Positive risks can often be managed more effectively if they are identified and dealt with before they have a chance to impact the project.<\/li>\n<li><strong>Pay attention<\/strong>: Identify any indications that a positive risk event is about to occur.<\/li>\n<li><strong>Involve your team<\/strong>: Positive risks can often be managed more effectively when the entire team is involved in the process.<\/li>\n<li><strong>Encourage creativity<\/strong>: Positive risks can often be managed more effectively if team members are encouraged to be creative and think outside the box.<\/li>\n<li><strong>Keep an open mind<\/strong>: Be willing to consider new ideas and approaches, as they may be necessary for taking advantage of positive risks.<\/li>\n<li><strong>Use a risk register<\/strong>: Create a risk list of all the things that might go right for you so you can keep track of them.<\/li>\n<li><strong>Factor your team&#8217;s risk tolerance<\/strong>: Positive risks can often be more effectively managed when the team\u2019s risk tolerance is taken into account.<\/li>\n<li><strong>Assign action steps<\/strong>: Create action items and assign people to watch or handle each risk.<\/li>\n<\/ul>\n<p>By following these tips, you can more effectively manage positive risks in your project and take advantage of opportunities as they arise.<\/p>\n<div style=\"background-color: #eaeffc;\">\n<h2><span class=\"ez-toc-section\" id=\"conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Positive risks in project management can be a great opportunity to improve your project. By carefully assessing each risk and taking steps to exploit or enhance them, you can make sure your project is well-positioned to take advantage of these opportunities.<\/p>\n<p>With proper planning and communication, you can set realistic expectations with stakeholders and keep them informed and involved throughout the project. By following these tips, you can more effectively manage positive risks in your project and take advantage of opportunities as they arise.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>If you&#8217;re a project manager, chances are that you&#8217;ve dealt with plenty of risks in the past. After all, part of your job is to identify potential threats to the project and develop plans to mitigate them. But what about positive risks? While they may seem like an oxymoron, positive risks are a real and &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;How To Use Positive Risks To Leverage Success in Project Management&#8221;<\/span><\/a><\/p>\n","protected":false},"author":17,"featured_media":5756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-5754","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Positive Risks in Project Management: Use It To Leverage Success<\/title>\n<meta name=\"description\" content=\"Positive risks in project management can be a great opportunity to improve your project. Check this guide on how to use positive risks to leverage success.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Positive Risks in Project Management: Use It To Leverage Success\" \/>\n<meta property=\"og:description\" content=\"Positive risks in project management can be a great opportunity to improve your project. Check this guide on how to use positive risks to leverage success.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/\" \/>\n<meta property=\"og:site_name\" content=\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-14T09:19:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-15T09:06:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Positive-risks-in-project-management.png\" \/>\n\t<meta property=\"og:image:width\" content=\"711\" \/>\n\t<meta property=\"og:image:height\" content=\"463\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Tim Barenscheer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tim Barenscheer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/\"},\"author\":{\"name\":\"Tim Barenscheer\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/f1a03a4dfdf615a5825ac3f9a0c848ee\"},\"headline\":\"How To Use Positive Risks To Leverage Success in Project Management\",\"datePublished\":\"2022-05-14T09:19:00+00:00\",\"dateModified\":\"2022-05-15T09:06:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/\"},\"wordCount\":1491,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Positive-risks-in-project-management.png\",\"articleSection\":[\"Project Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/\",\"name\":\"Positive Risks in Project Management: Use It To Leverage Success\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Positive-risks-in-project-management.png\",\"datePublished\":\"2022-05-14T09:19:00+00:00\",\"dateModified\":\"2022-05-15T09:06:47+00:00\",\"description\":\"Positive risks in project management can be a great opportunity to improve your project. Check this guide on how to use positive risks to leverage success.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Positive-risks-in-project-management.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Positive-risks-in-project-management.png\",\"width\":711,\"height\":463,\"caption\":\"Positive risks in project management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/positive-risks-in-project-management\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How To Use Positive Risks To Leverage Success in Project Management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"description\":\"Your Project Management Resource\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"width\":150,\"height\":39,\"caption\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teamly\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/f1a03a4dfdf615a5825ac3f9a0c848ee\",\"name\":\"Tim Barenscheer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g\",\"caption\":\"Tim Barenscheer\"},\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/author\\\/timbarenscheer\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Positive Risks in Project Management: Use It To Leverage Success","description":"Positive risks in project management can be a great opportunity to improve your project. Check this guide on how to use positive risks to leverage success.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/","og_locale":"en_US","og_type":"article","og_title":"Positive Risks in Project Management: Use It To Leverage Success","og_description":"Positive risks in project management can be a great opportunity to improve your project. Check this guide on how to use positive risks to leverage success.","og_url":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/","og_site_name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","article_published_time":"2022-05-14T09:19:00+00:00","article_modified_time":"2022-05-15T09:06:47+00:00","og_image":[{"width":711,"height":463,"url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Positive-risks-in-project-management.png","type":"image\/png"}],"author":"Tim Barenscheer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tim Barenscheer","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#article","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/"},"author":{"name":"Tim Barenscheer","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/f1a03a4dfdf615a5825ac3f9a0c848ee"},"headline":"How To Use Positive Risks To Leverage Success in Project Management","datePublished":"2022-05-14T09:19:00+00:00","dateModified":"2022-05-15T09:06:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/"},"wordCount":1491,"commentCount":0,"publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Positive-risks-in-project-management.png","articleSection":["Project Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/","url":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/","name":"Positive Risks in Project Management: Use It To Leverage Success","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#primaryimage"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Positive-risks-in-project-management.png","datePublished":"2022-05-14T09:19:00+00:00","dateModified":"2022-05-15T09:06:47+00:00","description":"Positive risks in project management can be a great opportunity to improve your project. Check this guide on how to use positive risks to leverage success.","breadcrumb":{"@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#primaryimage","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Positive-risks-in-project-management.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/05\/Positive-risks-in-project-management.png","width":711,"height":463,"caption":"Positive risks in project management"},{"@type":"BreadcrumbList","@id":"https:\/\/www.teamly.com\/blog\/positive-risks-in-project-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.teamly.com\/blog\/"},{"@type":"ListItem","position":2,"name":"How To Use Positive Risks To Leverage Success in Project Management"}]},{"@type":"WebSite","@id":"https:\/\/www.teamly.com\/blog\/#website","url":"https:\/\/www.teamly.com\/blog\/","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","description":"Your Project Management Resource","publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.teamly.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.teamly.com\/blog\/#organization","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","url":"https:\/\/www.teamly.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","width":150,"height":39,"caption":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teamly\/"]},{"@type":"Person","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/f1a03a4dfdf615a5825ac3f9a0c848ee","name":"Tim Barenscheer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/91e23a2399a65f91d3542dd40b73065fc729eede7f5a5e56004848efa322a265?s=96&d=mm&r=g","caption":"Tim Barenscheer"},"url":"https:\/\/www.teamly.com\/blog\/author\/timbarenscheer\/"}]}},"_links":{"self":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/5754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/comments?post=5754"}],"version-history":[{"count":5,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/5754\/revisions"}],"predecessor-version":[{"id":5765,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/5754\/revisions\/5765"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media\/5756"}],"wp:attachment":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media?parent=5754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/categories?post=5754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/tags?post=5754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}