{"id":5096,"date":"2022-02-25T01:32:33","date_gmt":"2022-02-25T01:32:33","guid":{"rendered":"https:\/\/www.teamly.com\/blog\/?p=5096"},"modified":"2023-09-18T13:19:47","modified_gmt":"2023-09-18T13:19:47","slug":"project-handover-plan","status":"publish","type":"post","link":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/","title":{"rendered":"Your Advanced Guide to Project Handover (Checklist Included!)"},"content":{"rendered":"<p>Have you ever played ball with a kid? The best fun ever, right? Well, only if both of you know the basic rule \u2013 before throwing the ball, you should make sure the other one is in the position to <i>catch<\/i> it.<\/p>\n<p>The same is true for project handover. You don\u2019t pass the project on to another manager or a client and wish them good luck. You take the time to prepare for the handover, do it properly, and ensure successful completion.<\/p>\n<p>In <a href=\"https:\/\/www.teamly.com\/blog\/project-management-ultimate-guide\/\">project management<\/a>, complicated processes can get out of control and turn into a mess; that\u2019s why project handover is a big milestone in your diary and requires your full attention.<\/p>\n<p>From early planning all the way through to handover and closeout, <a href=\"https:\/\/www.teamly.com\/blog\/product-vs-project-management\/\">project managers<\/a> have to deal with a lot of documentation (and quite rightly so). Overseeing this process in a professional manner is an absolute must.<\/p>\n<p>In this comprehensive guide, you\u2019ll dive deep into the concept of project handover, learn about the types, stages, and essentials of it, discover the best practices, and get a checklist to use for your next project.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5110\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/What-Is-Project-Handover-.png\" alt=\"What is Project Handover?\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/What-Is-Project-Handover-.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/What-Is-Project-Handover--300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/What-Is-Project-Handover--768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"what_is_project_handover\"><\/span>What is project handover?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Project handover is the point in the project management lifecycle when the completed tasks are being transferred to the deliverable owner. It marks the <i>completion of delivery<\/i> and <i>the start of the closure stage<\/i> of your project.<\/p>\n<p>Basically, the project goes from the Project Manager to the Operational Manager (sometimes referred to as an Integration Manager). Hence the description of project handover as transition from design to use.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5115\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Management-Processes.png\" alt=\"Project Management Processes\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Management-Processes.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Management-Processes-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Management-Processes-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<p style=\"text-align: center;\">Source: <a href=\"http:\/\/www.pmknowledgehub.com\/project-management-processes\/\">Project Management Knowledge Hub<\/a><\/p>\n<p>At first sight, this may sound simple enough. However, you should spend time clarifying what this definition means in your particular context.<\/p>\n<p>Be careful. A lack of certainty around the definition can be detrimental to the project\u2019s success. The crucial part is to agree \u2013 in advance \u2013 how your team and partners understand project handover and <i>when <\/i>the project is considered to be done. You should also get clear on <i>what<\/i> is being handed over \u2013 ownership, operational responsibility, management, continuity, knowledge, benefits realization or anything else. Make sure the <a href=\"https:\/\/www.teamly.com\/blog\/small-project-management\/\">project management plan<\/a> gives all the answers by outlining everyone\u2019s responsibilities and aligning everyone\u2019s efforts to a common goal.<\/p>\n<p>Moreover, if we view projects from the point of view of benefits delivery, handover is only the <i>start<\/i>, not the end. A good project handover is when it does what you all agreed it would, and the client gets what they\u2019ve paid for. Here\u2019s an example: projects that deliver a technical solution, but don\u2019t work as intended, are a failure because they simply don\u2019t work for the end users.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"types_of_project_handover\"><\/span>Types of project handover<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Although the overarching definition is that project handover is the transition of information and responsibility from one to another, project handover may refer to different schemes in different industries and situations.<\/p>\n<p>In construction, it can be the completion of a building or the end of the first year\u2019s warranty period of the building. In IT and software development, project handover might be when members of the project team are no longer involved in the project and you\u2019ve transferred it to another company or a client. Some teams can define it in terms of timing \u2013 when all requirements and tasks are signed off as complete. In certain contexts, it might even be when the benefits have been delivered to the end user.<\/p>\n<p>With all this diversity, it\u2019s important to have an agreed position between all parties; otherwise, you\u2019re all aiming for completely different targets.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5116\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/The-Stages-of-Project-Handover.png\" alt=\"The Stages of Project Handover\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/The-Stages-of-Project-Handover.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/The-Stages-of-Project-Handover-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/The-Stages-of-Project-Handover-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"the_stages_of_project_handover\"><\/span>The stages of project handover<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>As with all processes, the project handover can be viewed and discussed in terms of phases \u2013 before, during, and after. The following model helps us to split the entire process into three stages: pre-handover, handover, and post-handover.<\/p>\n<h3>Pre-handover<\/h3>\n<p>This is the preparation stage when you specify all details of the project handover. Several steps can be outlined here:<\/p>\n<p><b>Step 1: Design the transition plan.<\/b> <a href=\"https:\/\/www.teamly.com\/blog\/impact-of-poor-project-planning\/\">Poor planning<\/a> in project management can have damaging results, so divide the handover process into manageable parts and make a checklist of your transition <i>components<\/i>.<\/p>\n<p><b>Step 2: Clarify everyone\u2019s roles<\/b> in the project handover process, including the ones who will be involved in the process from the recipient side.<\/p>\n<p><b>Step 3: Set a deadline<\/b> when the handover should be completed and communicate it to all parties involved.<\/p>\n<p><b>Step 4: Create a communication plan<\/b> that outlines who communicates which information to whom and when.<\/p>\n<p><b>Step 4: Agree upon deliverables<\/b> required at handover and design end-of-job documentation. Note that the end-of-job documentation needs to be meaningful and consistent to the owner.<\/p>\n<h3>Handover<\/h3>\n<p>Time for the project handover.<\/p>\n<p><b>Step 1: Conduct a handover meeting<\/b> to discuss any necessary details and updates after the first stage is completed. Define <i>what<\/i> is actually handed over.<\/p>\n<p><b>Step 2: Have knowledge-sharing sessions.<\/b> Knowledge shouldn\u2019t be transferred during lunch breaks; you need pre-planned meetings to answer questions and provide clarifications as needed.<\/p>\n<p><b>Step 3: Transfer the ownership.<\/b> Provide access to documentation and all information needed, including accounts, credentials, requirements, as well as third-party services and tools.<\/p>\n<p><b>Step 4: Run a quality check<\/b> before you say, \u201cWe\u2019re done.\u201d<\/p>\n<p><b>Step 5: Project handover sign-off. <\/b>Congratulations! It\u2019s time for handshakes and signatures!<\/p>\n<h3>Post-handover<\/h3>\n<p>Post-handover is the follow-up or the support stage to make sure the end user has received all <a href=\"https:\/\/www.teamly.com\/blog\/project-deliverables\/\">deliverables<\/a>. The project is now in a live setting. At this stage, you sustain what you\u2019ve created by making sure all snags are taken care of. As a rule, this stage stretches from one to six months.<\/p>\n<p><b>Step 1: Carry out a project performance review. <\/b><\/p>\n<p><b>Step 2: Support the end user.<\/b> This can be either on-site or off-site support, depending on the industry you\u2019re operating in or the type of project you\u2019ve delivered.<\/p>\n<p><b>Step 3: Do monitoring and course-correcting. <\/b>Explain what the flow is and make suggestions of how people should make use of it. If any issues pop up after observations, update documentation as needed.<\/p>\n<p><b>Step 4: Collect stakeholders\u2019 feedback. <\/b>Keep this data organized; you\u2019ll surely need to consult it sooner or later. <b> <\/b><\/p>\n<p>Sounds overwhelming? No worries. You don\u2019t need to reinvent the wheel. Past failures have already taught industry practitioners useful information.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5111\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Essentials-For-Creating-a-Handover-Plan-in-Project-Management.png\" alt=\"Essentials For Creating a Handover Plan In Project Management\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Essentials-For-Creating-a-Handover-Plan-in-Project-Management.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Essentials-For-Creating-a-Handover-Plan-in-Project-Management-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Essentials-For-Creating-a-Handover-Plan-in-Project-Management-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"essentials_for_creating_a_handover_plan_in_project_management\"><\/span>Essentials for creating a handover plan in project management<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The handover of your next project will go smoothly and without excessive stress, if you\u2019re aware of the possible pitfalls and best practices. Here\u2019s a comprehensive overview of the lessons learned the hard way.<\/p>\n<h3>1. Take a benefits-based approach.<\/h3>\n<p>First, let\u2019s have a look at the definition of a <i>project<\/i> as formulated by the <a href=\"https:\/\/www.apm.org.uk\/resources\/what-is-project-management\/\">Association of Project Management<\/a>:<\/p>\n<blockquote><p>\u201cA project is a unique, transient endeavour, undertaken to achieve planned objectives, which could be defined in terms of outputs, outcomes or benefits.\u201d<\/p><\/blockquote>\n<div class=\"empty-spacer\" style=\"height:15px\"><\/div>\n<p>As you can see, the heavy emphasis is placed <i>not<\/i> on the effort part but on the <i>outputs<\/i>, <i>outcomes<\/i> and <i>benefits<\/i> projects deliver to the end user. When we view project management from this perspective, we can make a loud and clear statement: \u201cA project is considered to be failed if it isn\u2019t delivering the promised benefits.\u201d<\/p>\n<p>The same is true about project handover. Without a benefits-based approach to the handover process, your team is mainly concerned about getting this project done and rushing on to the next one. In this case, there is little attention and focus on real-life execution.<\/p>\n<p>Therefore, project handover shouldn\u2019t be treated as a date. You should take the time to clearly establish the benefits and prepare the client for using the product and handling any issues that may pop up.<\/p>\n<h3>2. Set measurable criteria for success.<\/h3>\n<p>What\u2019s one of the most frequent reasons for failed projects? Perhaps the project team doesn\u2019t deliver on their promise? Or maybe the client doesn\u2019t properly understand what they want? The shortest answer will be \u2013 it\u2019s a mix.<\/p>\n<p>Avoid vague and general statements. Not being clear about the outputs can jeopardize the project\u2019s overall success. Note that the benefits should not only be established but also communicated to all stakeholders at the outset. If the project hasn\u2019t been delivered and the <a href=\"https:\/\/www.teamly.com\/blog\/7-project-progress-performance-measurement-methods\/\">criteria to measure success<\/a> haven\u2019t been established initially, both the project team and the client are to blame.<\/p>\n<p>By the way, it\u2019s the responsibility of the project manager to create a balance between delivering project objectives on the one hand and ensuring the benefits realization on the other. Therefore, a wise decision would be to have an assigned team member measure the criteria and report to the project manager on a regular basis.<\/p>\n<h3>3. Know your client.<\/h3>\n<p>Clients come in all shapes and sizes, so understanding the many different types of clients is essential.<\/p>\n<p>You\u2019ll meet clients who expect you to take their hand and guide them every step of the way. You\u2019ll come across those who are resistant to change and lack the readiness to experiment. You\u2019ll have to handle know-it-all clients who have all answers before you tell them what works and what should be avoided.<\/p>\n<p>Take the time to learn more about the challenges they have and the solutions they\u2019re seeking. Above all, find the answer to one critical question upfront: \u201cWhat does a good transition mean to my client?\u201d<\/p>\n<h3>4. Plan for mini handovers.<\/h3>\n<p>Project handover is not something one and done. It\u2019s a transition, not a single date.<\/p>\n<p>Most project management methodologies will place handover within the project integration and project closure stages. That\u2019s why in the case of big projects, teams usually plan for multiple handovers rather than a single release.<\/p>\n<p>To keep everything under control, consider planning mini handovers throughout the project implementation. You might even set time for quick celebrations to keep the team\u2019s spirit up!<\/p>\n<h3>5. Aim for usable documentation.<\/h3>\n<p>Put data in a shared environment to enable just-in-time access to the information. Make sure all documentation is in a usable and searchable format. This will hinder doing things twice and save everyone precious time.<\/p>\n<p>Pro tip: documentation must be written <i>for the end users<\/i>. Yes, it may cause inconvenience and force you to take a fresh approach to your traditional way of creating documentation. But for written data to support knowledge transfer, it needs to be meaningful, applicable, and relevant to your end users.<\/p>\n<h3>6. Maintain the knowledge.<\/h3>\n<p>Things happen. Your team member may get sick or quit unexpectedly. Put every effort to keep the most valuable folks on board, but if it\u2019s not an option, you should get your priorities clear. Remember the golden rule: if you can\u2019t maintain the people, maintain the knowledge. By the way, this is why it\u2019s important to have the requirements written in as much detail as possible.<\/p>\n<p>That\u2019s it. You now have a detailed overview of the project handover stages and know the essentials you should try to put into practice.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5113\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Improving-Project-Handover-Tips-and-Best-Practices.png\" alt=\"Improving Project Handover: Tips And Best Practices\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Improving-Project-Handover-Tips-and-Best-Practices.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Improving-Project-Handover-Tips-and-Best-Practices-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Improving-Project-Handover-Tips-and-Best-Practices-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"improving_project_handover_tips_and_best_practices\"><\/span>Improving project handover: tips and best practices<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Learning how to hand over a project effectively can take a hard toll on you. Ready for expert tips to help you create a successful project handover plan? Let\u2019s get started!<\/p>\n<ul>\n<li><b>Keep the information from previous projects within reach<\/b>. Take a systematized approach to handover. Bring to the table the knowledge and lessons learned from your previous experiences. Keep that information at hand and actively review it before you embark on a new project. No matter if you\u2019re a newbie or a seasoned professional in the field, view each handover as an opportunity to collect valuable information for your upcoming endeavors.<\/li>\n<li><b>Produce handover materials from the end user\u2019s perspective<\/b> and plan the knowledge transfer from the beginning of the project. Documents should offer the extra level of detail and serve as a roadmap to making informed decisions and avoiding pitfalls.<\/li>\n<li>\n<p><b>Have end user representation on the project team.<\/b> Those who are going to use the project outputs should be represented on the project team throughout the project lifecycle. This will guarantee that all parties understand and are prepared to support handover. <\/p>\n<p>The client\u2019s role is pivotal. Their representation should be programmed into the project instead of being a last-minute thought. So plan for such representation and put this at the back of your project. Get the client in and use their input to guarantee the successful completion of the project. Learn how to <a href=\"https:\/\/www.teamly.com\/blog\/ways-to-encourage-participation-in-meetings\/\">increase participation in meetings<\/a> to get the most out of your regular sessions.<\/p>\n<\/li>\n<li>\n<p><b>Have a member of the project team on-site or as a point of contact.<\/b> After you\u2019ve handed the deliverables over to the end users, continue being in touch. The more you can retain the transfer, the better. Handle any possible modifications and ensure the compliance of deliverables with the agreed requirements.<\/p>\n<p>Don\u2019t involve all your team members; bring in a reduced project group to support the live setting. Usually, this takes two weeks at a minimum but can extend to a six-month period depending on the complexity of the delivered project.<\/p>\n<\/li>\n<li><b>Incorporate end user training into the completion stage.<\/b> Use the period leading up to the handover as efficiently as possible. Plan for imparting the information. Training sessions before the project handover will ensure that all stakeholders are on the same page and agree on the deliverables. Some companies will opt for concentrated training sessions just before the handover, while others will prefer longer and more detailed meetings. Do your best to cater to those specific business needs.<\/li>\n<\/ul>\n<p>Remember that at the end of the day, good performance on a project is likely to lead to referrals and repeat work. Successful handover is a good indicator that more prospects are going to seek your partnership and hit the purchase button.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5114\" src=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Handover-Checklist.png\" alt=\"Project Handover Checklist\" width=\"860\" height=\"396\" srcset=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Handover-Checklist.png 860w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Handover-Checklist-300x138.png 300w, https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Project-Handover-Checklist-768x354.png 768w\" sizes=\"auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"project_handover_checklist\"><\/span>Project Handover Checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Grab this checklist to guide you throughout the project handover process, keep everyone informed, and help your team enjoy a smooth transition.<\/p>\n<h3>1. Preparing for the handover<\/h3>\n<ol>\n<li>Identify the point(s) of contact.<\/li>\n<li>Clarify the frequency of communication and the top priority topics.<\/li>\n<li>Identify who is involved in the handover process from the project team. Clearly outline all roles and responsibilities.<\/li>\n<li>Set the timeline for milestones (or mini handovers).<\/li>\n<li>Set the date when the handover should be completed.<\/li>\n<li>Outline the deliverables (what exactly is going to be delivered).<\/li>\n<li>Outline the project outcomes (what the deliverables should provide to the end user).<\/li>\n<li>Have a breakdown of tasks and responsibilities to be transitioned to the end user.<\/li>\n<li>Identify any financial aspects involved.<\/li>\n<li>Details about change and risk management. Who is responsible for managing unexpected twists and turns?<\/li>\n<li>Set up training for all users.<\/li>\n<li>Complete all testing before you proceed.<\/li>\n<li>Create a communication plan on how you communicate the handover process to all stakeholders.<\/li>\n<\/ol>\n<h3>2. Handing over the project<\/h3>\n<ol>\n<li>Set up your handover meeting.<\/li>\n<li>Have a detailed presentation to make everything visually perceptible and easy to follow.<\/li>\n<li>Discuss the project handoff document and address all questions.<\/li>\n<li>Confirm the upcoming due dates and the deadline for project handover.<\/li>\n<li>Update the project handoff document once the meeting is complete.<\/li>\n<li>Return hired and borrowed equipment (if applicable).<\/li>\n<li>Hand over all project documentation.<\/li>\n<li>Transfer codebase, accounts &amp; credentials ownership (applicable to app development companies).<\/li>\n<li>Closeout contracts.<\/li>\n<li>Sign-off contractors.<\/li>\n<li>Update systems and records.<\/li>\n<li>Prepare a report to be used for reference.<\/li>\n<\/ol>\n<h3>3. Maintaining the handover<\/h3>\n<ol>\n<li>Complete <a href=\"https:\/\/www.teamly.com\/blog\/project-closure-checklist\/\">project closure<\/a> activities.<\/li>\n<li>Carry out a performance review.<\/li>\n<li>Complete course-correcting activities.<\/li>\n<li>Follow the transition according to planned documentation and provide support to the end user.<\/li>\n<li>Collect feedback and document any post-handover changes.<\/li>\n<\/ol>\n<p>One final note before we wrap up. Don\u2019t forget to customize the checklist and add any project-specific items.<\/p>\n<div style=\"background-color: #eaeffc;\">\n<h2><span class=\"ez-toc-section\" id=\"conclusion\"><\/span><b>Conclusion<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The cutting of a ribbon is a heart-warming ceremony, and you should try your best to reach that milestone with a proud smile.<\/p>\n<p>In project handover, you can\u2019t merely pass off the keys and let others handle the rest. Your handover plan should be well thought out in advance because hurried steps increase the likelihood of omitting vital details. Those who take over the project should be in the best position to continue the work or put the results to use (very much like the kid who should catch the ball during the game).<\/p>\n<p>Keep your team and your clients happy by creating a staggering success story. Happy clients will come back for more projects and will keep you busy with new and interesting endeavors.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Have you ever played ball with a kid? The best fun ever, right? Well, only if both of you know the basic rule \u2013 before throwing the ball, you should make sure the other one is in the position to catch it. The same is true for project handover. You don\u2019t pass the project on &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.teamly.com\/blog\/project-handover-plan\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Your Advanced Guide to Project Handover (Checklist Included!)&#8221;<\/span><\/a><\/p>\n","protected":false},"author":18,"featured_media":5112,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-5096","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project Handover Plan: An Advanced Guide (With Checklist)<\/title>\n<meta name=\"description\" content=\"Let&#039;s explore what is project handover plan. Learn about the types, stages, discover the best practices, and get a project handover checklist to use.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.teamly.com\/blog\/project-handover-plan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Handover Plan: An Advanced Guide (With Checklist)\" \/>\n<meta property=\"og:description\" content=\"Let&#039;s explore what is project handover plan. Learn about the types, stages, discover the best practices, and get a project handover checklist to use.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.teamly.com\/blog\/project-handover-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-25T01:32:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-18T13:19:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Handover-Plan-Project-Management.png\" \/>\n\t<meta property=\"og:image:width\" content=\"711\" \/>\n\t<meta property=\"og:image:height\" content=\"463\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Anna Aghlamazyan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anna Aghlamazyan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/\"},\"author\":{\"name\":\"Anna Aghlamazyan\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/b4d664d3e708be7951a16ecd2c141efc\"},\"headline\":\"Your Advanced Guide to Project Handover (Checklist Included!)\",\"datePublished\":\"2022-02-25T01:32:33+00:00\",\"dateModified\":\"2023-09-18T13:19:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/\"},\"wordCount\":2729,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/Handover-Plan-Project-Management.png\",\"articleSection\":[\"Project Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/\",\"name\":\"Project Handover Plan: An Advanced Guide (With Checklist)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/Handover-Plan-Project-Management.png\",\"datePublished\":\"2022-02-25T01:32:33+00:00\",\"dateModified\":\"2023-09-18T13:19:47+00:00\",\"description\":\"Let's explore what is project handover plan. Learn about the types, stages, discover the best practices, and get a project handover checklist to use.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/Handover-Plan-Project-Management.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/Handover-Plan-Project-Management.png\",\"width\":711,\"height\":463,\"caption\":\"Handover Plan Project Management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/project-handover-plan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Your Advanced Guide to Project Handover (Checklist Included!)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"description\":\"Your Project Management Resource\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"width\":150,\"height\":39,\"caption\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teamly\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/b4d664d3e708be7951a16ecd2c141efc\",\"name\":\"Anna Aghlamazyan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa9ff4955a5cd4aa769ec5ed116d2fd807e2f96f0877771605ca97a861add119?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa9ff4955a5cd4aa769ec5ed116d2fd807e2f96f0877771605ca97a861add119?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa9ff4955a5cd4aa769ec5ed116d2fd807e2f96f0877771605ca97a861add119?s=96&d=mm&r=g\",\"caption\":\"Anna Aghlamazyan\"},\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/author\\\/annaaghlamazyan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Handover Plan: An Advanced Guide (With Checklist)","description":"Let's explore what is project handover plan. Learn about the types, stages, discover the best practices, and get a project handover checklist to use.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/","og_locale":"en_US","og_type":"article","og_title":"Project Handover Plan: An Advanced Guide (With Checklist)","og_description":"Let's explore what is project handover plan. Learn about the types, stages, discover the best practices, and get a project handover checklist to use.","og_url":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/","og_site_name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","article_published_time":"2022-02-25T01:32:33+00:00","article_modified_time":"2023-09-18T13:19:47+00:00","og_image":[{"width":711,"height":463,"url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Handover-Plan-Project-Management.png","type":"image\/png"}],"author":"Anna Aghlamazyan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anna Aghlamazyan","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#article","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/"},"author":{"name":"Anna Aghlamazyan","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/b4d664d3e708be7951a16ecd2c141efc"},"headline":"Your Advanced Guide to Project Handover (Checklist Included!)","datePublished":"2022-02-25T01:32:33+00:00","dateModified":"2023-09-18T13:19:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/"},"wordCount":2729,"commentCount":0,"publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Handover-Plan-Project-Management.png","articleSection":["Project Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/","url":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/","name":"Project Handover Plan: An Advanced Guide (With Checklist)","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#primaryimage"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Handover-Plan-Project-Management.png","datePublished":"2022-02-25T01:32:33+00:00","dateModified":"2023-09-18T13:19:47+00:00","description":"Let's explore what is project handover plan. Learn about the types, stages, discover the best practices, and get a project handover checklist to use.","breadcrumb":{"@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.teamly.com\/blog\/project-handover-plan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#primaryimage","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Handover-Plan-Project-Management.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2022\/02\/Handover-Plan-Project-Management.png","width":711,"height":463,"caption":"Handover Plan Project Management"},{"@type":"BreadcrumbList","@id":"https:\/\/www.teamly.com\/blog\/project-handover-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.teamly.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Your Advanced Guide to Project Handover (Checklist Included!)"}]},{"@type":"WebSite","@id":"https:\/\/www.teamly.com\/blog\/#website","url":"https:\/\/www.teamly.com\/blog\/","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","description":"Your Project Management Resource","publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.teamly.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.teamly.com\/blog\/#organization","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","url":"https:\/\/www.teamly.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","width":150,"height":39,"caption":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teamly\/"]},{"@type":"Person","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/b4d664d3e708be7951a16ecd2c141efc","name":"Anna Aghlamazyan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fa9ff4955a5cd4aa769ec5ed116d2fd807e2f96f0877771605ca97a861add119?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fa9ff4955a5cd4aa769ec5ed116d2fd807e2f96f0877771605ca97a861add119?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fa9ff4955a5cd4aa769ec5ed116d2fd807e2f96f0877771605ca97a861add119?s=96&d=mm&r=g","caption":"Anna Aghlamazyan"},"url":"https:\/\/www.teamly.com\/blog\/author\/annaaghlamazyan\/"}]}},"_links":{"self":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/5096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/comments?post=5096"}],"version-history":[{"count":16,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/5096\/revisions"}],"predecessor-version":[{"id":11928,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/5096\/revisions\/11928"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media\/5112"}],"wp:attachment":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media?parent=5096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/categories?post=5096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/tags?post=5096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}