{"id":1576,"date":"2021-11-09T12:52:17","date_gmt":"2021-11-09T12:52:17","guid":{"rendered":"https:\/\/www.teamly.com\/blog\/?p=1576"},"modified":"2021-11-09T12:56:05","modified_gmt":"2021-11-09T12:56:05","slug":"zero-float-in-project-management","status":"publish","type":"post","link":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/","title":{"rendered":"A Run-Down On Zero Float In Project Management, Plus Tips On How To Manage It"},"content":{"rendered":"<p>We\u2019ve all managed a project at one point or another. Whether it\u2019s planning a party or leading a large project at work, it\u2019s important to understand the tasks that lead to the desired outcomes. One of the first steps many Project Managers will do is create the project\u2019s timeline in a series of tasks. When mapping out the project, each task gets a duration for competition. It will become clear which activities depend on others and which ones have more flexibility. When there is no extra time between activities, we have zero float, and it is considered a critical activity. A series of critical activities that are dependent on one another make up a critical path.<\/p>\n<p>If a critical activity slips and doesn\u2019t meet its deadline, it causes the project finish date to slip. And this is usually a no-go in project management. Mainly because deadline slips, even the small ones, typically have massive financial costs. <a href=\"http:\/\/www.connexion.com.au\/images\/Downloads\/Publication-True_Cost_of_Project_Delay.pdf\" target=\"_blank\" rel=\"noopener\">For the average size project, even a 10 percent overrun can result in a $5 million hit to the project\u2019s profitability<\/a>. Using the critical path method allows Project Managers to decide which tasks should take precedence, anticipate potential slips in the schedule, and make necessary adjustments. This makes project delays less likely and, therefore, project success more likely.<\/p>\n<p>Got some zero float activities in your project? Here are 4 tips to help you manage them:<\/p>\n<h2><span class=\"ez-toc-section\" id=\"1_start_with_a_thoroughly_defined_project_scope\"><\/span>1. Start with a thoroughly defined project scope<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Without a well-defined scope that addresses all the project details, it\u2019s pretty hard to achieve a killer result. All of the deliverables, no matter how small, need to be agreed upon by the project\u2019s parties. This will provide the guideline for which activities need to be included in the project. Without a complete scope, it\u2019s pretty hard to come up with an accurate project timeline. What ends up happening is deliverables get added on and your zero float tasks have to slip. Wreaking havoc on your budget, time constraints, and project quality.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"2_prepare_for_all_possibilities\"><\/span>2. Prepare for all possibilities<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>When looking at your critical path, start thinking about the <a href=\"https:\/\/www.crazyegg.com\/blog\/critical-path-project-management\/\" target=\"_blank\" rel=\"noopener\">\u201cwhat if\u201d scenarios<\/a> that could pop up. By thinking about these potential situations in advance, you\u2019re more prepared for anything that can happen. And if you look at the history of projects, especially those major high-risk ones, things happen, and contingency plans go a long way.<\/p>\n<p>You may want to look beyond your critical path at the tasks that have extra slack to prepare for these \u201cwhat if\u201d situations. You can use extra slack to extend a task, giving yourself more resources to allocate to the at-risk zero float tasks.<\/p>\n<p>You can also think about the zero float tasks that are most likely at risk of delays or other issues. See how the rest of the critical path is affected and how you can shorten particular task durations. Here are a few things you can do to fast track your tasks with zero float:<\/p>\n<ul>\n<li>Change a task\u2019s constraint (usually time, scope, or cost) to allow more adaptability in the schedule.<\/li>\n<li>Work overtime. No one likes to do it, but often it\u2019s necessary and worth it in the end.<\/li>\n<li>Commit additional resources to work on the zero float tasks that will move the project finish date forward.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"3_create_regular_project_update_reports\"><\/span>3. Create regular project update reports<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Regular project reports keep all of your stakeholders on top of what is happening with the project. It saves time by summarizing how the project is tracking for all stakeholders at once. Not only does it keep you and your team accountable, but it helps manage expectations by providing a platform to give a heads up if any of your zero float tasks are experiencing slippage.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"4_have_a_robust_change_management_process_in_place\"><\/span>4. Have a robust change management process in place<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>More often than not, scopes tend to creep as projects progress and can have a significant impact on the project. Sometimes change is inevitable, and it isn\u2019t a bad thing, but any changes to the scope must be managed correctly. Here are some vital elements of any change management plan:<\/p>\n<ul>\n<li>Justification for the change &#8211; what are the goals that this change will help achieve?<\/li>\n<li>Who does the change affect?<\/li>\n<li>Who is responsible for the new tasks needed?<\/li>\n<li>How does it affect the timeline?<\/li>\n<li>What are the costs?<\/li>\n<li>Who needs to sign off?<\/li>\n<li>Which stakeholders must be notified?<\/li>\n<\/ul>\n<p>Suppose a change affects your zero float tasks. In that case, it will likely affect the critical path and, therefore, the project completion date. With a strong change management plan, altering the critical path doesn\u2019t have to be an issue. It can even improve the project\u2019s deliverables in the long run. If you understand how changes will affect those zero float tasks, you\u2019ll be better able to take the steps necessary to manage and achieve success.<\/p>\n<div style=\"background-color: #EAEFFC;\">\n<h2><span class=\"ez-toc-section\" id=\"conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>When your project has time-critical tasks with no room for slack, they\u2019re considered zero float. With close attention to and management of these tasks, you\u2019ll be on your way to delivering your project on time and within budget. Follow these zero float management tips to help avoid the stress of slipping schedules and disastrous delays!<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>We\u2019ve all managed a project at one point or another. Whether it\u2019s planning a party or leading a large project at work, it\u2019s important to understand the tasks that lead to the desired outcomes. One of the first steps many Project Managers will do is create the project\u2019s timeline in a series of tasks. When &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;A Run-Down On Zero Float In Project Management, Plus Tips On How To Manage It&#8221;<\/span><\/a><\/p>\n","protected":false},"author":11,"featured_media":1580,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-1576","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zero Float In Project Management - What Is It &amp; How To Manage It<\/title>\n<meta name=\"description\" content=\"Got some zero float activities in your project? Check out these 4 tips on managing zero float in project management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zero Float In Project Management - What Is It &amp; How To Manage It\" \/>\n<meta property=\"og:description\" content=\"Got some zero float activities in your project? Check out these 4 tips on managing zero float in project management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/\" \/>\n<meta property=\"og:site_name\" content=\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-09T12:52:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-09T12:56:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/11\/Zero-float-in-project-management.png\" \/>\n\t<meta property=\"og:image:width\" content=\"711\" \/>\n\t<meta property=\"og:image:height\" content=\"463\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Adrian Stefirta\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Adrian Stefirta\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/\"},\"author\":{\"name\":\"Adrian Stefirta\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/51cef86660f03d665d5e995fda6e45b9\"},\"headline\":\"A Run-Down On Zero Float In Project Management, Plus Tips On How To Manage It\",\"datePublished\":\"2021-11-09T12:52:17+00:00\",\"dateModified\":\"2021-11-09T12:56:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/\"},\"wordCount\":879,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Zero-float-in-project-management.png\",\"articleSection\":[\"Project Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/\",\"name\":\"Zero Float In Project Management - What Is It & How To Manage It\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Zero-float-in-project-management.png\",\"datePublished\":\"2021-11-09T12:52:17+00:00\",\"dateModified\":\"2021-11-09T12:56:05+00:00\",\"description\":\"Got some zero float activities in your project? Check out these 4 tips on managing zero float in project management.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Zero-float-in-project-management.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Zero-float-in-project-management.png\",\"width\":711,\"height\":463,\"caption\":\"Zero float in project management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/zero-float-in-project-management\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A Run-Down On Zero Float In Project Management, Plus Tips On How To Manage It\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"description\":\"Your Project Management Resource\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#organization\",\"name\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/logo.png\",\"width\":150,\"height\":39,\"caption\":\"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource\"},\"image\":{\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teamly\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/#\\\/schema\\\/person\\\/51cef86660f03d665d5e995fda6e45b9\",\"name\":\"Adrian Stefirta\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e69eb32e46b09fed700612a00596f7a21c5cdbff312e7df8d66246ed29ccb170?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e69eb32e46b09fed700612a00596f7a21c5cdbff312e7df8d66246ed29ccb170?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e69eb32e46b09fed700612a00596f7a21c5cdbff312e7df8d66246ed29ccb170?s=96&d=mm&r=g\",\"caption\":\"Adrian Stefirta\"},\"url\":\"https:\\\/\\\/www.teamly.com\\\/blog\\\/author\\\/adrianstefirta\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zero Float In Project Management - What Is It & How To Manage It","description":"Got some zero float activities in your project? Check out these 4 tips on managing zero float in project management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/","og_locale":"en_US","og_type":"article","og_title":"Zero Float In Project Management - What Is It & How To Manage It","og_description":"Got some zero float activities in your project? Check out these 4 tips on managing zero float in project management.","og_url":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/","og_site_name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","article_published_time":"2021-11-09T12:52:17+00:00","article_modified_time":"2021-11-09T12:56:05+00:00","og_image":[{"width":711,"height":463,"url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/11\/Zero-float-in-project-management.png","type":"image\/png"}],"author":"Adrian Stefirta","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Adrian Stefirta","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#article","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/"},"author":{"name":"Adrian Stefirta","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/51cef86660f03d665d5e995fda6e45b9"},"headline":"A Run-Down On Zero Float In Project Management, Plus Tips On How To Manage It","datePublished":"2021-11-09T12:52:17+00:00","dateModified":"2021-11-09T12:56:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/"},"wordCount":879,"commentCount":0,"publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/11\/Zero-float-in-project-management.png","articleSection":["Project Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/","url":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/","name":"Zero Float In Project Management - What Is It & How To Manage It","isPartOf":{"@id":"https:\/\/www.teamly.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#primaryimage"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/11\/Zero-float-in-project-management.png","datePublished":"2021-11-09T12:52:17+00:00","dateModified":"2021-11-09T12:56:05+00:00","description":"Got some zero float activities in your project? Check out these 4 tips on managing zero float in project management.","breadcrumb":{"@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#primaryimage","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/11\/Zero-float-in-project-management.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/11\/Zero-float-in-project-management.png","width":711,"height":463,"caption":"Zero float in project management"},{"@type":"BreadcrumbList","@id":"https:\/\/www.teamly.com\/blog\/zero-float-in-project-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.teamly.com\/blog\/"},{"@type":"ListItem","position":2,"name":"A Run-Down On Zero Float In Project Management, Plus Tips On How To Manage It"}]},{"@type":"WebSite","@id":"https:\/\/www.teamly.com\/blog\/#website","url":"https:\/\/www.teamly.com\/blog\/","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","description":"Your Project Management Resource","publisher":{"@id":"https:\/\/www.teamly.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.teamly.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.teamly.com\/blog\/#organization","name":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource","url":"https:\/\/www.teamly.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","contentUrl":"https:\/\/www.teamly.com\/blog\/wp-content\/uploads\/2021\/09\/logo.png","width":150,"height":39,"caption":"Official Teamly Blog - Official Teamly Blog - Your Project Management Resource"},"image":{"@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teamly\/"]},{"@type":"Person","@id":"https:\/\/www.teamly.com\/blog\/#\/schema\/person\/51cef86660f03d665d5e995fda6e45b9","name":"Adrian Stefirta","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e69eb32e46b09fed700612a00596f7a21c5cdbff312e7df8d66246ed29ccb170?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e69eb32e46b09fed700612a00596f7a21c5cdbff312e7df8d66246ed29ccb170?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e69eb32e46b09fed700612a00596f7a21c5cdbff312e7df8d66246ed29ccb170?s=96&d=mm&r=g","caption":"Adrian Stefirta"},"url":"https:\/\/www.teamly.com\/blog\/author\/adrianstefirta\/"}]}},"_links":{"self":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/1576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/comments?post=1576"}],"version-history":[{"count":4,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/1576\/revisions"}],"predecessor-version":[{"id":1579,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/posts\/1576\/revisions\/1579"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media\/1580"}],"wp:attachment":[{"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/media?parent=1576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/categories?post=1576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teamly.com\/blog\/wp-json\/wp\/v2\/tags?post=1576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}